Search In this Thesis
   Search In this Thesis  
العنوان
Developing a User Friendly Platform for Nuclear Power Plants in-Service Inspection \
المؤلف
Abou-Rema, Hanan Ali Farahat.
هيئة الاعداد
باحث / حنان على فرحات أبوريمة
مشرف / سعيد عبد المجيد عجمى
sagamy@link.net
مشرف / محمد حسن محمد حسن
مشرف / حسن ابراهيم شعبان
مناقش / هناء حسن أبو جبل
hanaaag@hotmail.com
مناقش / ايهاب عبد السلام قراقيش
الموضوع
Nuclear Engineering.
تاريخ النشر
2016.
عدد الصفحات
104 p. :
اللغة
الإنجليزية
الدرجة
ماجستير
التخصص
الهندسة (متفرقات)
تاريخ الإجازة
1/12/2016
مكان الإجازة
جامعة الاسكندريه - كلية الهندسة - الهندسة النووية
الفهرس
Only 14 pages are availabe for public view

from 127

from 127

Abstract

Over the Nuclear Power Plant (NPP) operating lifetime, the operating organization should examine PRI’s (Pressure Retaining Items) for possible deterioration so as to determine whether they are acceptable for continued safe operation or whether remedial measures should be taken. American Society of Mechanical Engineers (ASME) Code, Section XI, ―Rules for In-service Inspection of Nuclear Power Plant Components‖, provides requirements for examination, testing, and inspection of components and systems. These rules require a mandatory program to assure adequate safety and to manage deterioration and aging effects. The aim of the present work is to develop a simple and easy way for preparing In-service Inspection (ISI) program. The work is achieved by collecting and arranging ISI requirements in ASME Section XI for Class One Components into a group of Logic Flaw charts (LFC’s). Then the LFC’s are divided into 11 modules. These modules are transferred into a specific platform (ISI-PWR, In-Service Inspection of Pressurized Water Reactor) in eight parts. The platform interprets directly the Code requirements and simplifies the inspection program development in a handy and user-friendly format. The developed platform has the advantages of avoidance of misinterpretation of the Code requirements and reducing the time required to prepare an ISI program.