A 5D BIM-based Integrated Analysis of Design Impact on Project Constructability and Cost\
المؤلف
Mahmoud,Sarah Waleed
هيئة الاعداد
باحث / سارة وليد محمود علي بركات
مشرف / ابراهبم عبدالرشيد
مشرف / محمد المكاوي
مناقش / ابراهيم محمود مهدي
تاريخ النشر
2020.
عدد الصفحات
126p.:
اللغة
الإنجليزية
الدرجة
ماجستير
التخصص
الهندسة المدنية والإنشائية
تاريخ الإجازة
1/1/2021
مكان الإجازة
جامعة عين شمس - كلية الهندسة - انشاءات
الفهرس
Only 14 pages are availabe for public view

from 159

from 159

Abstract

The construction industry is rapidly growing all over the world. Construction managers are always on the quest for finding tools and methods to facilitate the construction process and improve the time and cost of construction projects. The consideration of constructability issues as early as the design phase can significantly improve the construction process leading to smooth project delivery and savings in time and cost.
This research aims to develop an assessment model that can be used to evaluate the constructability of a design based on the most common constructability principles. The assessment model requires the use of BIM technology as an automated tool for collecting all the project data. The study was conducted in three phases which are literature review, questionnaire survey, and model development. Through extensive literature review and because of the use of BIM as a data collecting tool, 10 factors were identified as the most relevant in studying the constructability. A questionnaire survey was then used to calculate the relative importance of each factor based on the opinions of construction experts.
A case study of a reinforced concrete commercial project was used to apply the workflow, construct a BIM model and perform constructability assessment. Building systems included in the study are structural and architectural systems. Furthermore, an analysis is carried out to analyze the effect of the current design choices on the cost of the project.
The assessment model can be used iteratively several times to achieve the project maximum required constructability. It can also be used throughout the project phases to continuously update the project data. Results show that the assessment model is easy to use and that can produce a sufficiently good evaluation of the constructability of the project.