![]() | Only 14 pages are availabe for public view |
Abstract The using of traditional two-dimensional (2D) drawing construction industry creates communication gaps among owners, architects, and contractors. These gaps exist in all phases of project, but are more evident in operation and maintenance management (O&MM). Universities administration is currently starting to explore and implement new methods to receive more valuable as-built information. A BIM-MM is an emerging information maintenance technology that manages and promotes a collaborative process for the architectural engineering and construction. It can facilitate the exchange and interoperability of information management, and therefore could provide enhanced benefits to Universities’ Buildings. The aim of this thesis is to generated and design a SWOT analysis tool (Strengths, Opportunities, Weaknesses, Threats) that would preliminary evaluate feasibility for the application of enhanced BIM-MM approach in UBE in Egypt. The research work consists of two main tools; questionnaire and interview. This questionnaire is structured to evaluate respondents experience to assess the actual practices Abstract II adopted in MM and the expected benefits from BIM implementation on University buildings. This questionnaire has been sent to more than 200 persons in different educational background (graduate, master degree and Ph.D.) in public and private Universities in Egypt. The objective of the tool is to leverage the existing data in BIM-MM to enhance the quality of University building environment. The interviews have designed to determine the level of applying MM using BIM at Universities buildings environment. The interviews were applied with MM managers of three public Universities (Ain Shams University, Cairo University and Al-Azhar University) and three privet Universities (American University in Cairo, British University in Egypt and Arab Academy for Science, Technology & Maritime Transport). The interviews have involved the MM managers at the studied Universities to discuss the value of these parameters and attributes for enhancing University buildings environment at Egypt. This interview is structured to evaluate Universities experience (MM department manager) to assess the actual practices adopted in MM and the expected benefits from BIM implementation on Universities buildings |